Skip to main content
  • Expand
  • togglefullscreen, theme_remui
  •  Log in
      Forgot Password?
  • Home

Redpath LMS

  1. Home
  2. Courses
  3. 2501 Procedures

2501 Plant Yard Recruitment Procedure

2501 Procedures

Purpose: The purpose of this procedure is to describe in detail the process of recruiting and e...

2501 Control of Drawings and Drawing Registers

2501 Procedures

Purpose: How to correctly name and save a drawing in an organised way that will improve efficie...

2501 Electrical Installation Routine Examinations Coal

2501 Procedures

The purpose of this procedure is to identify a site wide consistent approach for Routine Electrical ...

2501 - High Voltage Switching

2501 Procedures

Purpose: The purpose of this procedure is to identify a site wide consistent approach for High Volta...

2501 Electrical Commissioning Procedure for New Installations up to 1000 V

2501 Procedures

Purpose: The purpose of this procedure is to identify a site wide consistent approach for commission...

2501 Electrical Installation Routine Examinations Metalliferous

2501 Procedures

Purpose: The purpose of this procedure is to identify a site wide consistent approach for Routine El...

2501 High Voltage Installation Commissioning

2501 Procedures

Purpose: The purpose of this procedure is to identify a site wide consistent approach for High Volta...

2501 Resetting High Voltage Circuit Breakers in the Tripped Position

2501 Procedures

Purpose: The purpose of this procedure is to identify a site wide consistent approach to resetting ...

2501 Live Testing of Electrical Equipment

2501 Procedures

Purpose: The purpose of this procedure is to identify a site wide consistent approach for Live Tes...

2501 Disconnection of Low Voltage Electrical Cables

2501 Procedures

Purpose: The purpose of this procedure is to identify a site wide consistent approach to disconnec...

2501 Cutting and Welding Outside of Designated Areas

2501 Procedures

Purpose: This document is intended to provide required instruction for the safe job planning for Wel...

  • 1 (current)
  • 2
  • Next
  • 1 (current)
  • 2
  • Next
2501 Plant Yard Recruitment Procedure
2501 Control of Drawings and Drawing Registers
2501 Electrical Installation Routine Examinations Coal
2501 - High Voltage Switching
2501 Electrical Commissioning Procedure for New Installations up to 1000 V
2501 Electrical Installation Routine Examinations Metalliferous
2501 High Voltage Installation Commissioning
2501 Resetting High Voltage Circuit Breakers in the Tripped Position
2501 Live Testing of Electrical Equipment
2501 Disconnection of Low Voltage Electrical Cables
2501 Cutting and Welding Outside of Designated Areas
2501 Assembly, Servicing, Maintenance, Refuelling and Lubricating of Plant
2501 Dismantling and Recharging Accumulators
2501 Hot Tools
2501 Jacking and Blocking
2501 Inspection of Electrical Equipment Prior to Site Delivery
2501 Resetting Low Voltage Circuit Breakers In The Tripped Position
2501 In-service Safety Inspection & Testing of Electrical Equipment
2501 Electrical Installations Routine Examinations - QLD
2501 Calibration and Testing of Electrical Test Equipment
  • 1 (current)
  • 2
  • Next

Contact Us

REDPATH AUSTRALIA PTY LTD.

Brisbane Office
63 Lavarack Avenue
Eagle Farm
QLD 4009
Australia
Tel: +61 7 3868 5000
Fax: +61 7 3268 3734


Follow Us

The Redpath Group © Copyright 2017
Get the mobile app
Bitnami