Skip to main content
  • Expand
  • togglefullscreen, theme_remui
  •  Log in
      Forgot Password?
  • Home

Redpath LMS

  1. Home
  2. Courses
  3. 2584 SWI's

2584 Working With Hydraulics and Replacement of Hydraulic Hoses: Revision 1

2584 SWI's

Purpose: This Standard Work Instruction provides the necessary actions and controls for Working...

2584 Operating Overhead Gantry Cranes: Revision 1

2584 SWI's

Purpose: This Standard Work Instruction provides the necessary actions and controls to Operate ...

2584 Operating a Light Vehicle Hoist: Revision 1

2584 SWI's

Purpose: This Standard Work Instruction provides the necessary actions and controls to Operate ...

2584 Jacking and Blocking: Revision 1

2584 SWI's

Purpose: This Standard Work Instruction provides the necessary actions and controls to carry ou...

2584 Bogging Development Headings: Revision 1

2584 SWI's

Purpose: This Standard Work Instruction provides the information necessary to carry out the Bog...

2584 Bogging a Stope Draw Point: Revision 1

2584 SWI's

Purpose: This Standard Work Instruction provides the information necessary to safely and efficientl...

2584 Working Near Open Holes: Revision 1

2584 SWI's

Purpose: This Standard Work Instruction provides the information necessary to carry out work ar...

2584 Underground Mine Traffic: Revision 1

2584 SWI's

Purpose: This Standard Work Instructions documents rules and procedures to be followed for all unde...

2584 Operating MineArc (Refuge Chamber): Revision 1

2584 SWI's

Purpose: The purpose of this Standard Work Instruction is to provide operating instructions on ...

2584 Resetting High Voltage Circuit Breakers in the Tripped Position: Revision 1

2584 SWI's

Purpose: This procedure provides the information necessary to carry out the resetting of high volt...

2584 Hot Tools: Revision 1

2584 SWI's

Purpose: This Standard Work Instruction provides the necessary actions and controls to carry ou...

  • Previous
  • 1
  • 2
  • 3 (current)
  • 4
  • 5
  • …
  • 7
  • Next
  • Previous
  • 1
  • 2
  • 3 (current)
  • 4
  • Next
2584 Low Voltage Electrical Installation Commissioning: Revision 1
2584 Live Testing of Electrical Equipment: Revision 1
2584 In-Service Safety Inspection & Testing of Electrical Equipment: Revision 1
2584 Calibration and Testing of Electrical Test Equipment and PPE: Revision 1
2584 Production Drilling: Revision 1
2584 Development Ground Support: Revision 1
2584 QA - Shotcrete Test Panels & Cylinders Testing: Revision 1
2584 Road Construction and Maintenance: Revision 1
2584 Surface & Underground Refuelling: Revision 1
2584 Tag Board: Revision 1
2584 Drilling into Previously Fired Ground: Revision 1
2584 Development Breakthrough: Revision 1
2584 Using Hand tools: Revision 1
2584 Using a Compressed Air Blowpipe: Revision 1
2584 Use of Directional Lasers: Revision 1
2584 Water Cart Operations: Revision 1
2584 Working from a Basket or Platform Basket (EWP): Revision 1
2584 Personnel Working in Decline: Revision 1
2584 Conduct Hand Held Drilling: Revision 1
2584 Underground Haul and Dump: Revision 1
  • Previous
  • 1
  • 2
  • 3 (current)
  • 4
  • Next

Contact Us

REDPATH AUSTRALIA PTY LTD.

Brisbane Office
63 Lavarack Avenue
Eagle Farm
QLD 4009
Australia
Tel: +61 7 3868 5000
Fax: +61 7 3268 3734


Follow Us

The Redpath Group © Copyright 2017
Get the mobile app
Bitnami