2584 Paste Plant QAQC Testing: Revision 1
2584 SWI's
Purpose: To carry out QA/QC on the paste plant to ensure that all equipment and systems are ready ...
2584 Paste Plant Shutdown: Revision 1
2584 SWI's
Purpose: To shut down the paste plant in a safe controlled and efficient manner and to flush out t...
2584 Paste Plant Online Checks: Revision 1
2584 SWI's
Purpose: To perform checks on the paste plant during operations, to ensure that the plant is runni...
2584 Paste Plant Start Up and Shut Down Protocols: Revision 1
2584 SWI's
Purpose: This Standard Work Instruction identifies the sequence of events required to ensure an ef...
2584 Paste Plant Start Up: Revision 1
2584 SWI's
Purpose: To start up the paste plant in a safe, controlled and efficient manner to produce quality...
2584 Paste Plant Pre-Start Checks: Revision 1
2584 SWI's
Purpose: To carry out pre-start checks on the paste plant to ensure that all equipment and systems...
2584 Underground Mine Traffic: Revision 2
2584 SWI's
2584 Remote Bogging - Bogging Operation: Revision 1
2584 SWI's
Purpose: To describe the steps involved in the safe inspection, testing, set-up & operatio...
2584 Charging of Development Headings: Revision 1
2584 SWI's
Purpose: The Standard Work Instruction provides the information necessary to carry out the Chargin...
2584 Production Charge Up: Revision 1
2584 SWI's
Purpose: This Safe Work Instruction’s purpose is to show the determined ‘Best Way’ of carryi...
2584 Paste Plant Communications: Revision 1
2584 SWI's
Purpose: To ensure good communications between the paste plant and underground are maintained to r...
2584 Paste Plant Underground Dump Valves: Revision 1
2584 SWI's
Purpose To ensure that the dump valves on the underground paste fill reticulation are maintained a...